- Solar panel installation in Varennes, Qc.
- Maximum output: 7.9 KW
- Solar panels: LG 360 Watts
- Commissioning date: May, 2018
- Installation time: 2 daysv
- This is a fourth installment in our miniseries, to watch them all:
This is a fourth installment in our miniseries, to watch them all: